The dismantling, of the fourth tower crane from STK Stravers. On Ballast Nedam's construction site, of the Feringa building. At the Zernike campus in Groningen-The Netherlands.

Dismantling of wind farm Irene Vorrink. The wind farm of Vattenfall was dismantled by the F and B group. The park consisted of 28 turbines and stood next to the highway A6, between the Ketelbrug and Lelystad in the Netherlands.

Demontage van vierde torenkraan van STK Stravers, op bouwterrein Ballast Nedam.

De demontage van het voormalig windpark Irene Vorrink. Het windpark van Vattenfall werd gedemonteerd door de F en B group.

De installatie van 89 windturbines volgde na het heien van funderingspalen op het IJsselmeer.

The installation of the 89 wind turbines for Wind Farm Fryslan - The Netherlands

The temporary Suurhoff Bridge sailed on a pontoon construction through Rotterdam The Netherlands to the Maasvlakte.

In order to even better respond to the most diverse customer requirements Mercedes-Benz 61 adding two models to its Actros range the new Actros F and Edition 2

Heien op het IJsselmeer een project voor windpark Fryslan het heien van 89 funderingspalen werd uitgevoerd door Van Oord.

Piling on the water on one of the largest lakes in the Netherlands The project for the Frysln wind farm was carried out by Van Oord

Q-Park lied haar ondergrondse parkeergarage in Groningen 10cm zakken Er werd gebruik gemaakt van 102 vijzels en 600 meter aan leidingen

QPark had their underground parking garage in the City of Groningen the Netherlands lowered by 10cm

Bouw van een groot windmolenpark op het IJsselmeer 98 windturbines met energie voor 500000 huishoudens

A large wind farm is being built on the IJsselmeer The farm will consist of 89 wind turbines

Lausward The Transformer Transport II The Gasturbine Transport III Towards the finishing line.
Prepared for the transport of the second Theemstrac railway bridge to the final location.