The transportation and installation of six enormous pumps for one of the largest pumping stations in Europe at the Afsluitdijk near Den Oever Netherlands Mammoet carried out this job with precision by lifting and transporting.
Uitdagende operatie van het transport en de plaatsing van zes mega pompen, voor het nieuwe gemaal in de Afsluitdijk.
Transport of new Euvelgunner bridges decks for the City of Groningen in the Netherlands
Transport van de nieuwe Euvelgunner bruggendekken voor de Stad Groningen. Het transport over het water door een gedeelte van Friesland en Groningen.
Transport of foundation components for offshore wind turbines, by water to Eemshaven the Netherlands
Funderingsonderdelen voor windturbines, op transport via binnenwateren naar de Eemshaven Groningen.
The dismantling, of the fourth tower crane from STK Stravers.
On Ballast Nedam's construction site, of the Feringa building.
At the Zernike campus in Groningen-The Netherlands.
Dismantling of wind farm Irene Vorrink.
The wind farm of Vattenfall was dismantled by the F and B group.
The park consisted of 28 turbines and stood next to the highway A6,
between the Ketelbrug and Lelystad in the Netherlands.
Demontage van de vierde torenkraan,
op bouwterrein van Ballast Nedam.
Die gebruikt werd voor de bouw van de Feringa Building in Groningen.
De demontage van het voormalig windpark Irene Vorrink. Het windpark van Vattenfall werd gedemonteerd door de F en B group.
De installatie van 89 windturbines volgde na het heien van funderingspalen op het IJsselmeer.
The installation of the 89 wind turbines for Wind Farm Fryslan - The Netherlands.
The temporary Suurhoff Bridge sailed on a pontoon construction through Rotterdam The Netherlands to the Maasvlakte.
In order to even better respond to the most diverse customer requirements Mercedes-Benz 61 adding two models to its Actros range the new Actros F and Edition 2.
Heien op het IJsselmeer een project voor windpark Fryslan het heien van 89 funderingspalen werd uitgevoerd door Van Oord.
Piling on the water on one of the largest lakes in the Netherlands. The project for the Frysln wind farm was carried out by Van Oord.
Q-Park lied haar ondergrondse parkeergarage in Groningen 10cm zakken. Er werd gebruik gemaakt van 102 vijzels en 600 meter aan leidingen.
QPark had their underground parking garage in the City of Groningen the Netherlands lowered by 10 cm.
Bouw van een groot windmolenpark op het IJsselmeer 98 windturbines met energie voor 500000 huishoudens.
A large wind farm is being built on the IJsselmeer.
The farm will consist of 89 wind turbines.
Lausward
The Transformer Transport II
The Gasturbine Transport III
Towards the finishing line.
Prepared for the transport of the second Theemstrace railway bridge,
to the final location.
Rotterdam - The Netherlands
After a boat fair Boot Holland.
A house boat was placed two cranes.
Boot Holland Leeuwarden - The Netherlands
In between during the phasing out of the boat fair.
Boot Holland Leeuwarden - The Netherlands
After closing the boat event Leeuwarden the boats are hoisted on transport material.
Boot Holland Leewarden - The Netherlands
Saipem 7000 at Eemshaven to perform standard maintenance and inspection activities, on the Saipem 7000. Eemshaven - The Netherlands
Complex lifting task of a bridge section of the second new railway bridge Theemsroad trace Rotterdam - The Netherlands.
Third transport of bridge sections,
for new bridge across Thomassentunnel. Á Theemstrace railway bridge.
Rotterdam - The Netherlands.
Work prior to the installation of the Helperzoom tunnel Groningen - the Netherlands
Installation radial lock gate sluice complex Eefde - the Netherlands.
Pointed door installation, new lock.
Eefde - The Netherlands.
Transport of lock gates from South Korea to Seaport IJmuiden.
IJmuiden - the Netherlands.
Transport and installation of Viaduct Beijum Noord - Groningen - the Netherlands.
Back in Time 2014.
Preparations for later transport and installation of viaduct.
Borgbrug - Groningen The Netherlands
Back in time!
Installation Borg bridge Groningen 2016.
Installation of table bridge Aduard.
Aduard - The Netherlands.
By Hebo Maritiemservice
Loading of piling machine for transport to new train viaduct project Zuidhorn - The Netherlands.
Transport of a tunnel deck for placing under a railway now moving to a temporary location
STV Production
Video Overview